Product Details
img
img
img
img

Construction Piling Used APAM

Min.Order : 1 Pieces Quick Quotation >

Conpany Profile

6 YRS Shandong Tongli Chemical Co.,Ltd

Transaction Level:
sales@tonglihuagong.com
+8613864402265

Product Details

Find high quality construction piling used apam with competitive price here. Please rest assured to buy construction piling used apam with Shandong Tongli Chemical Co.,Ltd

Construction Piling used APAM


Welcome to consult construction piling used apam price with Shandong Tongli Chemical Co.,Ltd, which is one of the leading construction piling used apam suppliers in China and also a productive construction material for bored pilling work factory.

products10.jpg

Construction Technologies

Clivil Engineering,Drilling

TONGLI3332  is a specially treated high molecular weight Partially Hydrolyzed Polyacrylamide polymer for all water-base drilling fluids. It functions as viscosifying agent, shale and bore-hole stabilizer, encapsulator, bentonite extender, flocculation agent and assist with fluid loss control.Its usage is recommended for the preparation of every drilling fluid especially for:

? Water well drilling

? Mineral Exporation and drilling

? Construction material for bored pilling work.


Items

Anionic Polyacrylamide

Specifications

Results

Characteristics

Appearance

White Powder

White Powder


Filter Ratio

=2

1.5


Toxicity

Non-toxic

Non-toxic

Solid Content

=90%

91.3%

Molecular Weight(million)

HIgh

High

Insoluble Deposite

=0.2%

0.13%

Degree  Of  Hydrolysis(%)

Medium

Medium

Apparent viscosity , mPa.s

=12.5

16

Disslove Time(minute)

=90

60

Residue Monomer(%)

=0.05

=0.05


Specific advantage and benefits

? Fast swelling

? Low consumption

? Suitable in all kind of soils

Preparation

Construction piling used pam Mix with water using a high efficient mixer.To get best properities at least 6 hours of aging are required.Keep the mud in circulation during the use.

Stroage

Construction piling used pam Sealed and stored in the dry and ventilated place to prevent from rain, high temperature and strong sunlight.

Packaging

Construction piling used pam Bulk and 25kg paper/valve bags.

Recommend Product