Min.Order : 1 Pieces Quick Quotation >
Conpany Profile
Product Details
Application:
This unit aims to forming(building) timing belt sleeve, poly v-belt sleeve (ribbed v-belt sleeve) and V-belt sleeve automated etc . power transmission belt.
Features:
- This forming (building) system is consist of three parts : Cord let-off machine (2sets), Principle forming machine (Double A&B Working Position) )and 8-position material frame (1set).
- One the principle machine, two kinds of cord which will be released by two cord let-off machine can be put on it at the same time. One the end A and B, there is mould replacement position seperately. The rubber sheet can be choosed automatically on the 8-position frame and the cover fabric can be rolled automatically when the rubber sheet is winding on the mould.
Parameter:
-Length of belt: 500-2500mm
-Cord laying speed: 160m/min
-Cord laying pitch: 1-10mm/r
-Cord tension: 40-200N
Recommend Product