Min.Order : 1 Pieces Quick Quotation >
Conpany Profile
Product Details
Product Introduction
Water can contaminate the engine lubrication oil because of leaks in the cooling system or from water vapor.Water vapor is a combustion by-product. During the blow-by process high combustion pressure
Delivery Time
A. Tooling and Samples:
Die casting, within 40-50days after getting order
Gravity casting or low pressure casting, within 30-40days after getting order
B. Productions:
After getting order 30-40days.If you have very urgent order, we can check it the best delivery time for you.
Factory Capabilities
Material | 1.Sand casting&Gravity casting&Low pressure die casting: |
Process | Sand casting, Gravity casting, high pressure die casting, low pressure die casting and CNC Machining casting. |
Designs |
|
Equipment of Casting |
|
Testing facility | spectrometer, tensile test machine, hardness test machine, CMM dimension report |
Certificate | ISO9001:2008/Rosh/SGS/BV |
Standard | ASTM, DIN,JIS, EN, ISO, GB standards |
Software | Pro/E,UG, Solidworks, Auto CAD, PDF |
Precision machining | CNC turning, milling, drilling, grinding, cutting, reaming and threading |
Finished | Polishing, sand blasting, heat treatment, painting, powder coating, anodizing, electroplating, Chrome plating, mirror polishing. |
Service | OEM service available. |
Product | All kinds of aluminum casting: include automotive parts, railroad parts, medical parts, marine parts, lighting parts, pump body, valve parts, architectural parts and furniture parts so on |
Advantage |
A)Near Sea Port and Air Port-Ningbo Sea Port and Yiwu Airport or Hangzhou Airport;
|
Inspection |
|
Packing | Carton Box with Pallet/Wooden Box/Steel Pallet |
Recommend Product