Product Details
img
img
img
img

DIN17175 Steel Pipe

Min.Order : 1 Pieces Quick Quotation >

Conpany Profile

6 YRS Changzhou Hongtai Precision Steel Pipe Co.,Ltd

Transaction Level:
export@hongtaipipe.com
+8613306110086

Product Details

Find high quality din17175 steel pipe with competitive price here. Please rest assured to buy din17175 steel pipe with Changzhou Hongtai Precision Steel Pipe Co.,Ltd

DIN17175 is a German Industrial Standards; it is for seamless tubed of heat-resistant steels.

Product Name

ST35.8 steel pipe

ST45.8 steel pipe

17Mn4 steel pipe

19Mn5 steel pipe

15Mo3 steel pipe

13CrMo44

chemical analysis

C: 0.17;Si:0.10-0.35;Mn:0.40-0.80;P: 0.040; S: 0.040

C: 0.21;Si:0.10-0.35;Mn:0.40-1.20;P: 0.040; S: 0.040;

C:0.14-0.20;Si:0.20-0.40;Mn:0.90-1.20;P: 0.040; S: 0.040;Cr 0.30

C:0.17-0.22;Si:0.30-0.60;Mn:0.90-1.20;P: 0.040; S: 0.040;Cr 0.30

C:0.12-0.20;Si:0.10-0.35;Mn:0.40-0.80;P: 0.035; S: 0.035;Mo:0.25-0.35

C:0.10-0.18;Si:0.10-0.35;Mn:0.40-0.70;P: 0.035; S: 0.035;Cr:0.70-1.10;Mo:0.45-0.65

Tensile Strength

350-480MPa

410-530MPa

460-580MPa

510-610MPa

450-600MPa

440-590MPa

Yield strength

T 16mm, 235MPa;16 T 40mm, 225MPa;40 T 60mm, 215MPa

T 16mm, 255MPa;16 T 40mm, 245MPa;40 T 60mm, 235MPa

T 16mm, 270MPa;16 T 40mm, 270MPa;40 T 60mm, 260MPa

T 16mm, 310MPa;16 T 40mm, 310MPa;40 T 60mm, 300MPa

T 16mm, 270MPa;16 T 40mm, 270MPa;40 T 60mm, 260MPa

T 16mm, 290MPa;16 T 40mm, 270MPa;40 T 60mm, 280MPa

Standard


DIN17175

Length

As customer s request

Packaging

Standard export packing, packed in woven bags, with two nylon slings, or can be customized as request

Heat Treatment/      Delivery Condition

  1. Cold finished and stress-relieved annealing BKS(+SR)

Heat treatment is applied following the last cold forming process. Subject to appropriate processing conditions, the increase in the residual stresses involved enables both forming and machining to a certain degree.

  1. Annealed    GBK(+A)

The last Cold forming process is followed by annealing in a controlled atmosphere.

  1. Normalized   NBK(+N)

  2. The last cold forming process is followed by annealing above the upper transformation point in a controlled atmosphere.

Delivery Time

Within 35-50 days from receiving deposit

Payment Term

100% L/C at sight or 30% deposit, 70% balance against copy of B/L

Usage/Application

Pipes for high pressure boiler

Recommend Product