Min.Order : 1 Pieces Quick Quotation >
Conpany Profile
Product Details
Changzhou Hongtai Precision Steel Pipes Co. is a professional steel pipe trading company; we have rich experience in exporting pipes and can always provide the solutions for our customers, it is our honor to serve you.
Product Name | 20G steel pipe | 20MnG steel pipe | 25MnG steel pipe | 12Cr1MoVG steel pipe | 15CrMoG steel pipe |
chemical analysis | C:0.17-0.23;Si:0.17-0.37;Mn:0.35-0.65;P: 0.025; S: 0.015 | C:0.17-0.23;Si:0.17-0.37;Mn:0.70-1.00;P: 0.025; S: 0.015; | C:0.22-0.27;Si: 0.17-0.37;Mn: 0.17-1.00;P: 0.025; S: 0.015 | C:0.08-0.15;Si: 0.17-0.37;Mn: 0.40-0.70;P: 0.025; S: 0.010;Cr:0.90-1.20;Mo:0.25-0.35;V:0.15-0.30 | C:0.12-0.18;Si: 0.17-0.37;Mn: 0.40-0.70;P: 0.025; S: 0.015; Cr:0.80-1.10;Mo:0.40-0.55 |
Tensile Strength | 410-550MPa | 415-560MPa | 485-640MPa | 470-640MPa | 440-640MPa |
Yield strength | 245 | 240 | 275 | 255 | 295 |
Standard | GB5310 | ||||
Length | As customer s request | ||||
Packaging | Standard export packing, packed in woven bags, with two nylon slings, or can be customized as request | ||||
Heat Treatment/ Delivery Condition |
Heat treatment is applied following the last cold forming process. Subject to appropriate processing conditions, the increase in the residual stresses involved enables both forming and machining to a certain degree.
The last Cold forming process is followed by annealing in a controlled atmosphere.
| ||||
Delivery Time | Within 35-50 days from receiving deposit | ||||
Payment Term | 100% L/C at sight or 30% deposit, 70% balance against copy of B/L | ||||
Usage/Application | Pipes for high pressure boiler | ||||
Main Market | Asia, Middle East, Europe, etc. |
Recommend Product